Quote-only product family

MS125 cloud-managed access switching with 48-port PoE capacity

The MS125-48FP is a 48-port MS125 switch with high-power PoE capability and 10GbE SFP+ uplink connectivity, quoted with its required licensing and site design.

Availability, lead time, licensing, and configuration are confirmed during the quote.

Product familyCisco Meraki Cloud-Managed Switches

Models

1 of 1 models

Meraki Ethernet Switch - 48 Ports - Manageable - 2 Layer Supported - Modular - Twisted Pair, Optical Fiber - 1U High - Rack-mountable

SKU
MS125-48FP-HW

No additional specifications listed

List price$4,009.98Availability and lead time confirmed in quote

Compatibility and references

Source review date: 2026-08-09

Official documentation

The repository row MS125-48FP-HW matches the model listed in Cisco Meraki's MS125 Series datasheet. The datasheet identifies the 48FP variant as having 740 W of available PoE/PoE+ power and a fixed internal power supply. It also documents 10GbE SFP+ connectivity for high-speed links to aggregation switches and describes the MS125 platform as managed through the Meraki cloud management platform. This family is appropriate for access-layer planning where port count, PoE budget, uplink design, rack installation, and the Meraki management model all need to be considered together. The 740 W figure is a published device capability, not a promise that every deployment can allocate that amount to customer devices; the actual design still depends on connected-device draw, uplink topology, environmental conditions, and the customer's network architecture. HTS will confirm Dashboard organization, switch role, uplink optics or cables, rack requirements, PoE load, required Meraki license or subscription term, availability, and site fit before issuing a quote. No compatibility with a specific downstream device is inferred from the family page.

How to choose

  • Confirm 48-port requirement and PoE budget
  • Confirm 10GbE SFP+ uplink requirements
  • Confirm optics, cables, rack, and power planning
  • Confirm Meraki licensing and organization assignment